Integrated "PV-Storage-Charging-Inspection" Demonstration Project

2025-03-27 20:06:05


Integrated "PV-Storage-Charging-Inspection" Demonstration Project





Tianzhao New Energy · PV-Storage-Charging Smart Station
Shantou's First "Source-Grid-Load-Storage" Integrated New Energy Facility


This project is a comprehensive energy station that combines photovoltaic power generation (including distributed PV and carport PV systems), distributed energy storage, and EV charging infrastructure. Equipped with CALB's industrial and commercial energy storage system, the facility achieves a total PV installed capacity of 143.91kW and features an energy storage system rated at 200kW/450kWh. The charging setup includes 8 units of 120kW dual-gun DC fast chargers2 units of 360kW (1-to-8 split-type) dual-gun superchargers, and 10 units of 7kW AC charging points, enabling simultaneous charging for 42 electric vehicles in an advanced multi-energy integration solution.





Shantou Tianzhao New Energy Technology Co., Ltd.

SHANTOU ZhongAoTianZhao TRADE CO., LTD.

No. 1608, Building 1, Guorui Exhibition Center, 28 Zhucheng Road, Shantou City

Home
Product
New Business
Contact Us